Contractors

SUPERIOR CONSTRUCTION ADVANTAGES OF THE ADJUSTA JOINTLOCK SYSTEM

  • The contractor has the certainty of providing a rigid rebar connection at the joint, without the risk of creep movement and strength reduction of re-straightened bars, or the possibility of incorrectly fitted screw-in connectors and shear cone concrete rupture with ferrule anchors.
  • Significant time and labour savings can be achieved on typical flooring jump-form construction compared to alternate labour intensive connection systems.
  • JointLOCK is used with a reusable rebate board for speed, low cost and ease of use for the formwork contractor. Note: The JointLOCK System shall not be installed using any other type of rebate former or system.
  • Avoids the serious risk of back injury caused when re-straightening pull-out bar systems.
  • No special training or skills are needed to install the JointLOCK System.
  • Customised to suit your project design and construction requirements.
  • Straight forward installation procedure reduces pour cycle times on fast-track high-rise projects.
  • Engineered with matched load load bearing components providing the equivalent strength to carry 100% capacity of N16 reinforcement bar for axial tensile stress, flexural stress, bending moments and shear forces. Link to TDS401 JointLOCK Technical Data Sheet.
  • Designed to eliminate the need for bending and re-straightening of starter bars, ensuring the bar strength is not reduced or connectivity compromised.
  • Saves money by eliminating the need for metal boxes used with pullout bars.
  • The JointLOCK System can be specified in any configuration of starter bar spacing and position at central or top and bottom of slab.
  • The JointLOCK Connector is factory fitted by Adjusta with a development length of reinforcing bar for starter bar provisions in the interfacing concrete section.
  • Surety of mechanical connection due to straightforward installation and ease of inspection for on-site quality control. 
  • Ease of installation speeds up provision of wall anchorage and connection of starter bars.
  • Standard and customised specifications and connection scheduling formats for construction use.
  • Occupational Workplace Health and Safety benefits due to reduced risk of back injuries from the repetitive task of straightening bars or fitting bars to ferrule or chemical anchors.
  • Certified for compliance to benchmark ASTM and ISO standards for mechanical splices A1034M.
  • Used and approved by Australia’s premier construction companies, and proven in landmark high-rise towers.
  • All JointLOCK System components are 100% Australian made.

For details on specifying the JointLOCK system configuration with standard or variable components go to the Specification Data Sheet TDS491

View our Frequently Asked Questions.

 

 

 

Latest News

Adjusta is is the agent for THREADSURE threaded ferrals. Click here to read more.

 

JointLOCK is the connector of choice on the landmark Surfers Paradise Hilton project currently being built on the Gold Coast by Brookfield Multiplex. As the project’s twin tower cores reach skywards, the JointLOCK System provides the wall to slab connections with the strength, efficiency, and assurance required for fast track high-rise construction.